Senior Advanced Manufacturing Engineer - Material Flow Optimization
Posted Jul 30, 2026 · We last checked this listing on Sep 20, 2026
Likely interview questions for this role
Written from this job description, not a generic list. Each one notes what the interviewer is really checking.
Behavioral
Tell me about a time you designed a replenishment strategy, whether kanban, min/max, milk-run, or JIT. What made you pick that approach over the others?
real hands-on experience choosing replenishment methods based on part characteristics, not textbook recall
Describe a material flow redesign project you led that reduced touchpoints or travel time. What was the before and after, and how did you measure the improvement?
whether they can quantify impact and have actually driven a project end to end versus supporting one
Tell me about a time you got involved early in an NPI project. What material flow decisions did you influence before the design was locked?
whether they understand the value of early involvement versus reacting after layouts are fixed
Tell me about a cross-functional workshop you led to roll out a material flow change. Who pushed back, and how did you get them on board?
facilitation skill and ability to manage resistance from operations, supply chain, or quality
Technical
Walk me through how you'd build a PFEP database from scratch for a complex production line. Where do you start and what data do you need first?
whether the candidate actually understands PFEP structure and sequencing, not just the acronym
How do you tie a PFEP to takt time and line-side consumption so replenishment from the hub or warehouse actually keeps up with production?
depth of understanding on the math and logic linking material flow to production rate
If you had to choose between a tugger route, AGVs, and a manual system for a new line, what would you weigh to make that call?
practical judgment on material handling equipment tradeoffs like cost, flexibility, and floor layout
How have you used SAP or Oracle to support or build out a PFEP? What specific data fields or transactions were you pulling from the system?
whether ERP experience is concrete and specific or just a resume bullet
What lean tools do you actually use when mapping a material flow process, and can you give an example of waste you found and eliminated using one of them?
whether 5S and value stream mapping are applied skills or just terms they can name
Situational
Say you inherit a line where the PFEP says one thing and what's actually happening on the floor is different. How do you find out why, and what do you do about it?
how they handle data integrity issues and whether they go to the floor instead of trusting the spreadsheet
You've optimized a layout on paper, but the operations team says it will slow down changeover. How do you handle that disagreement?
how they balance engineering optimization against operator and floor realism, and whether they compromise or dig in
How do you train plant engineers or logistics teams to use PFEP tools once you've built them, especially if they've never worked with the system before?
ability to transfer ownership and build sustainable processes rather than being the sole expert
Practice this interview out loud.
Offer builds a real interview for this exact role at Generac from your resume and this job description, asks the questions one at a time, and tells you what landed. The first one is free.
Practice this out loudThe full job description
As published by Generac.
Related jobs
New Product Sourcing Specialist - Purchasing
Posted Sep 17 · Verified Sep 20
Intern Engineering - Advanced Manufacturing
Posted Sep 17 · Verified Sep 20
Mechanical Engineer II
Posted Sep 17 · Verified Sep 20
Material Handler - Weekend Shift
Posted Sep 17 · Verified Sep 20
Inside Sales Representative Residential
Posted Sep 17 · Verified Sep 20
Industrial Engineer I
Posted Sep 16 · Verified Sep 20